11/27/21 - The boat is ready to be finished.
View of the interior.
11/30/21 - The gaps between the panels are filled with epoxy.
12/1/21 - A seal coal of epoxy is applied to the hull.
The undersides of the seats are sealed with epoxy..
12/6/21 - The hull is partially sanded.
12/7/21 - The hull is fully sanded.
1/1/22 - The first coat of primer is applied to the hull.
1/3/22 - The primer is sanded.
1/4/22 - First coat of paint is applied to the hull.
1/7/22 - Several coats have been applied.
1/25/22 - Oarlock risers are epoxied in place.
The rudder trunk assembly is started.
1/30/22 - The rudder is temporarily mounted.
1/31/22 - The rudder is shaped.
The daggerboard is shaped.
Top sides of the seats are ready for epoxy.
The spars are epoxied to full length.
2/1/22 - The spars are shaped.
Batten for sail track is epoxied to the mast.
The interior is given a seal coat of epoxy.
2/2/22 - Sail track and halyard block are temporarly fit on the mast.
Daggerboard and rudder are fiberglassed and rudder truck epoxy coated.
2/3/22 - Foam for reserve floatation is epoxied together.
2/4/22 - Foam is cut to fit under the seats.
Foam will be painted to blend in.
Interior is partially sanded.
Spars are epoxy coated.
2/8/22 - The interior is sanded.
Foam floatation is sealed with epoxy.
Areas to be varnished are taped off.
2/11/22 - The foam is given a coat of primer.
2/14/22 - The interior is primed.
2/15/22 - The primer is sanded.
First coat of paint is applied.
Floatation foam is painted.
2/17/22 - The rudder trunk is painted.
Several coats of paint have been applied.
Floatation foam is epoxied to the underside of the seats.
2/18/22 - The boat is ready for varnish.
2/20/22 - Accents of wood are varnished.
2/23/22 - The boat is moved outside now that finishing is complete.
View from the bow.
Seats are installed.
Varnishing the spars is started.
2/28/22 - Sailtrack, shrouds, and gooseneck are installed on the mast.
3/1/22 - The mast shrouds are set up.