3/9/22 - The boat as I got it.
-
The forward hatch well is stitched together.
-
3/11/22 - The hull is sanded.
-
The hull is fiberglassed.
-
3/14/22 - Fill coat of epoxy and an extra fiberglass rub strip is applied.
-
Fiberglass tube is installed as a place to attach a carrying handle.
-
3/17/22 - Holes and any gaps in the deck are filled with epoxy.
-
3/18/22 - The deck is sanded.
-
4 oz fiberglass cloth is laid on the deck.
-
The cloth is saturated with epoxy.
-
3/21/22 - Forward hatch opening is traced on the deck.
-
Hatch is cut out.
-
3/23/22 - The forward hatch recess is epoxied in place.
-
Coaming risers are epoxied in place.
-
3/24/22 - The forward hatch recess is sanded.
-
Coaming riser and aft hatch are sanded.
-
Forward hatch is fiberglassed.
-
Aft hatch is fiberglassed.
-
3/28/22 - Half of the hull is sanded.
-
3/30/22 - The coaming lip is epoxied in place.
-
3/31/22 - The coaming lip is fiberglassed.
-
4/1/22 - Exits for rudder cables are epoxied in place.
-
4/4/22 - The coaming is given a fill coat of epoxy.
-
4/11/22 - A coat of primer is applied.
-
3/12/22 - The primer is sanded.
-
First coat of paint.
-
4/16/22 - Red accent paint is applied.
-
4/21/22 - The backrest is installed.
-
4/27/22 - The rudder system is installed.
-
Hatch rims are epoxied in place.
-
4/28/22 - The hatch covers are put on and the boat is finished!