8/15/19 - The panels are laid out.
The panels are epoxied together.
8/16/19 - The flipside of the panels are epoxied together.
The first two panels are wired together.
8/17/19 - The hull is close to being fully wired.
8/18/19 - The hull is fully wired.
8/19/19 - The seams are filled with thickened epoxy.
8/20/19 - The seams on the other side are filled with epoxy.
8/26/19 - The inside seams between hull planks are filled with thickened epoxy.
Fiberglass cloth is laid out on the hull interior.
The cloth is saturated with epoxy.
The bulkheads are fiberglassed.
The cockpit panel is epoxied together.
Excess cloth is trimmed.
8/27/19 - The recessed deck fittings are cut out.
The deck is mostly wired together.
The deck is fully wired together.
The seams are filled with thickened epoxy.
8/29/19 - Fiberglass tape is laid out on the underside of the deck.
The underside of the deck is ready for epoxy.
The fiberglass and wood are saturated with epoxy.
Footbrace studs are epoxied in place.
Gaps in the deck seams are filled with epoxy.
Gaps in the hull seams are filled with epoxy.
8/30/19 - The recessed deck fittings are epoxied in place.
The deck is epoxied to the hull.
Bulkheads are fiberglassed.
The inside of the sheer joint is epoxied.
Hatch parts and coaming lips are fiberglassed.
8/31/19 - The inside of the sheer joint is epoxied.
9/1/19 - The hull is sanded smooth.
Fiberglass cloth is laid out on the hull.
The fiberglass is saturated with epoxy.
9/2/19 - Glass tape is laid along the keel.
The first fill coat of epoxy is applied.
Second fill coat.
9/3/19 - The deck is fiberglassed.
First fill coat is applied to the deck.
9/4/19 - The coaming riser is epoxied in place.
The myrtle coaming lip is epoxied in place.
The coaming lip is fiberglassed.
The glass is saturated.
The coaming and deck are given a fill coat of epoxy.
9/9/19 - The hatches are cut out.
Hatch lips are epoxied together.
9/10/19 - The aft hatch lips are epoxied in place.
Coaming is cleaned up and sealed with epoxy.
Aft bulkhead is installed.
Forward hatch lip is installed.
The clamps are removed.
9/21/19 - The entire boat has been sanded.
9/22/19 - The boat is washed and ready for varnish.
The first coat of varnish is applied.
10/7/19 - Strapless hatch toggles are sealed with epoxy.
10/23/19 - The hatch gaskets are glued in place and the deck rigging is installed.
Strapless hatch system is installed.