11/13/23 - The boat is ready to be finished.
11/15/23 - The spars are epoxied to full length.
11/25/23 - The mast partner is temporarily mounted.
The gudgeons and pintles are temporarily mounted.
11/27/23 - The spars have been shaped and holes drilled for rigging.
Hanger bolts for the removable thwart are installed.
Nameplate is installed. Also holes for gudgeons have been drilled and filled.
11/29/23 - The spars are epoxy sealed.
11/30/23 - Foam flotation blocks are epoxied to the seats.
12/4/23 - The under seat foam is taped off.
Foam is painted matte black.
12/5/23 - The interior is washed.
First coat of varnish is applied.
12/8/23 - First coat of varnish on the thwarts.
Second coat of varnish on the interior.
12/12/23 - The hull is sanded.
Aft seats and rudder are varnished.
12/13/23 - The wood is looking shiny!
12/15/23 - Thwarts are installed.
12/17/23 - The mast fits nicely.