Kea Custom Boats
Options
Completed Projects
Large Boat Projects
Strip Built Kayaks
Stitch and Glue Kayaks
Small Boat Projects
Standup and Surfboard Projects
Refinished Boats
Student Built
RV Trailers
Current Projects
Contact Us
Videos of the build. We apologize for the slow download speed. The videos will play after a few minutes.
Week 1 - Drawing and cutting of bulkheads.
Didi 23 build week 1.
Week 1.
Installing the stringers.
Didi 23 installing stringers.
Installing stringers.
Sanding the hull.
Didi 23 Hull sanding
Sanding
Turning the hull over.
Didi 23 Hull Turning
Hull Turning
Keel raising and lowering.
Didi 23 Lifiting keel
Lifting keel
Lowering the mast.
Didi 23 Lowering the mast
Lowering the mast.
Back to Hull C