-
2/12/25 - The kit is unwrapped.
-
2/13/25 - The bottom and #1 panels are wired together.
-
2/14/25 - Panels #2 and #3 are wired in place. The transom and temp frame are wired in place.
-
Panel #4
-
All the panels are in place and the boat is flipped over.
-
2/15/25 - The wires are tightenedand the seams between penels are filled with epoxy.
-
2/26/25 - The boat is flipped and the wires are pulled out.
-
2/27/25 - The inside seams are partially filled.
-
3/3/25 - The bow stem is filled with epoxy.
-
All the interior joints are filled with epoxy.
-
Rope attachement point is installed.
-
3/4/25 - Fiberglass cloth is laid on half the interior.
-
3/5/25 - The glass is saturated with epoxy.
-
3/6/25 - Second half of the interior gets fiberglass.
-
The glass is epoxy saturated.
-
3/17/25 - Breasthook is epoxied in place.
-
Quarter knees are installed.
-
3/19/25 - The interior is sanded.
-
3/20/25 - The seats are laid out.
-
3/25/25 - Stiffeners are epoxied to the undersides of the thwarts.
-
The aft seat is tack glued into place.
-
Forward seat is tack glued into place.