9/10/19 - The kit is ready to be unpacked.
-
9/11/19 - The panels are glued to full length.
-
The forward seat halves are epoxied together.
-
Fiberglass cloth is laid onto the hull panels.
-
Rails are epoxied together.
-
Fiberglass is saturated with epoxy.
-
Number 3 panels with fiberglass.
-
Bulkheads get fiberglass reinforcement.
-
Number 3 panels are saturated.
-
Bulkheads are saturated.
-
9/12/19 - Bulkheads and one panel are wired in place.
-
Bulkheads and transom wired in place.
-
Number 2 panels are wired in place.
-
Number 3 panels are wired in place.
-
Rails are epoxied in place.
-
9/15/19 - The hull is flipped over.
-
The seams between panels are filled with epoxy.
-
9/16/19 - The wires are removed from the boat.
-
The top transom reinforcement is epoxied in place.
-
A plywood stem piece is epoxied in place.
-
The edge of the hatch cover is fiberglassed.
-
The second reinforcement piece is epoxied on.
-
Underside of the forward seat is reinforced.
-
9/17/19 - Reinforcement pieces are epoxied in place.
-
Forward seat is fiberglassed.
-
The bow is trimmed.
-
The take apart bulkheads are fiberglassed.
-
The inside seams are filletted.
-
9/19/19 - Spacer strips are added to the take apart bulkheads.
-
Take apart bulkheads are epoxied in place.
-
Bulkhead reinforcements are epoxied in place.
-
9/20/19 - The outside faces of the stern seats are fiberglassed.
-
The daggerboard trunk is epoxied in place.
-
10/1/19 - The seams are taped off.
-
Fiberglass tape is epoxied to the seams.
-
10/2/19 - The daggerboard slot is ready to be cut out.
-
Daggerboard slot is cut out.
-
The hatch lip is epoxied to the deck.
-
Fiberglass pieces are epoxied to the daggerboard slot.
-
Fillets are added to the underside of the seats.
-
10/3/19 - The aft tank sides are test fit.
-
The mast hole is cut into the forward deck.
-
Towing hole tube is epoxied in place.
-
Mast tube is epoxied in place.
-
Aft seat tank walls are filleted on the inside.
-
Aft seat tank tops are epoxied in place.
-
Flip side of skeg is fiberglassed.
-
Bulkhead knees are fiberglassed.
-
Take apart bolts are epoxied in place.
-
10/7/19 - Cutting the boat in half has begun!
-
Cutting continues across the bottom.
-
The boat is cut in half!
-
Aft tank edges are fiberglassed.
-
Fiberglass is trimmed.
-
10/9/19 - The take apart bulkheads are fiberglassed.
-
10/10/19 - The forward seat is epoxied in place.
-
The breasthook is epoxied in place.
-
The breasthook is epoxied in place.
-
10/12/19 - Edges are covered with fiberglass.
-
10/14/19 - The exposed top edges of the boat are coverd with fiberglass.
-
The glass is saturated with epoxy.
-
The forward half of the boat.
-
The hull is partially sanded.
-
Both hull sections are sanded smooth.
-
The underside of the rail is filetted.
-
10/15/19 - 8 oz and 6 oz fiberglass is laid on the hull.
-
The glass is saturated with epoxy.
-
Bow section
-
The skeg is epoxied in place.
-
10/16/19 - The transom is fiberglassed.
-
The first fill coat of epoxy is applied.
-
Forward section.
-
10/22/19 - The interior is given several fill coats of epoxy.
-
10/23/19 - An epoxy edge is applied to the foils.
-
10/24/19 - The foils are fiberglassed.
-
11/5/19 - The aft interior is sanded.
-
The forward interior is sanded.
-
11/6/19 - The rudder hardware is test fit.
-
11/7/19 - The aft hull is sanded.
-
The forward hull is sanded.
-
11/8/19 - The hull is washed and ready for primer.
-
11/9/19 - The first coat of primer is applied.
-
The aft section
-
11/10/19 - The second coat of primer is applied.
-
11/11/19 - The primer is sanded.
-
The first coat of paint is applied.
-
11/12/19 - Second coat of paint is applied.
-
Forward section.
-
11/14/19 - The pattern for footbraces is laid out.
-
Footbraces and oarlock risers are epoxied in place.
-
11/18/19 - First coat of varnish is applied to the foils.
-
First coat of varnish on the aft section.
-
First coat of varnish on the forward section.
-
First coat of varnish on the extra pieces.
-
11/19/19 - Several more coats of varnish are applied to the aft section.
-
Several more coats of varnish are applied to the forward section.
-
11/20/19 - The gudgeons are installed.
-
11/24/19 - The rudder is test fit.
-
12/1/19 - The rubber gunwale bumper is glued in place.