1/22/19 - The panels will be joined with a stip of fiberglass tape.
-
1/23/19 - Fiberglass tape is applied to the other side of the panels.
-
1/24/19 - The bottom panels are wired together.
-
No. 1 and 2. panels are wired together with the temporary frames.
-
All of the panels are wired together.
-
Wires are all tightened.
-
The boat is flipped and ready for the seams to be epoxied.
-
1/25/19 - The seams are filled with thickened epoxy.
-
1/26/19 - The wires are pulled and gaps are filled with epoxy.
-
1/28/19 - Half of the hull is sanded smooth.
-
The hull is sanded smooth.
-
Fiberglass cloth is laid on the hull.
-
The cloth is saturated with epoxy.
-
1/29/19 - Two fill coats of epoxy are applied.
-
The center deck panels are epoxied together.
-
1/31/19 - The deck panels are partially wired.
-
The deck seams are filled with thickened epoxy.
-
2/1/19 - The deck is flipped over and prepped for fiberglass tape.
-
2/2/19 - The underside of the deck is sealed with epoxy.
-
2/5/19 - The temporary bulkheads are removed and the interior is sanded.
-
The interior is fiberglassed.
-
2/6/19 - The port side footbrace studs are installed.
-
The starboard side footbrace studs are installed.
-
2/7/19 - The deck is epoxied to the hull.
-
2/8/19 - The port side interior shear seam is filled with epoxy and covered with fiberglass tape.
-
Starboard side.
-
2/11/19 - The deck is sanded smooth.
-
Fiberglass cloth is laid on the deck.
-
The cloth is saturated with epoxy.
-
2/12/19 - The overhanging cloth is trimmed and a fill coat of epoxy is applied.
-
2/12/19 - The overhanging cloth is trimmed and a fill coat of epoxy is applied.
-
2/13/19 - The hatches are traced out on the deck.
-
Forward hatch is cut out.
-
Aft hatch is cut out.
-
Aft hatch is cut out.
-
Forward bulkhead is epoxied in place.
-
2/15/19 - The coaming riser is epoxied in place.
-
The coaming lip is epoxied in place.
-
2/17/19 - The coaming is giving a fill coat of epoxy.
-
The hatch lips are epoxied in place.
-
2/20/19 - Epoxy endpours are installed.
-
2/21/19 - The deck is sanded in preparation for varnishing.
-
The hull is sanded.
-
2/26/19 - Sanding dust is washed off the hull.
-
The first coat of varnish is applied to the hull.
-
2/28/19 - Several coats of varnish have been applied.
-
Several coats of varnish are applied to the hatch covers.
-
3/1/19 - The deck is ready for varnish.
-
The first coat of varnish is applied to the deck.
-
3/3/19 - Several coats of varnish are applied to the deck.
-
3/8/19 - The upgraded seat is installed.