2/5/16 - The boat is finished!
Pygmy Murrelet 4 PD
12/13/15 - Hull panels are laid out and prepped for gluing.
#3 Panels are wired into place.
1/2/16 - The seams are filled with thickened epoxy.
The first section is wetted out with epoxy.
1/7/16 - The deck is wired up.
The deck seams are filled with thickened epoxy.
The cockpit area is fiberglassed.
1/12/16 - Spacers for the adjustable knee brace system are clamped and filletted.
The deck is taped and epoxied into place.
1/15/16 - The entire deck is fiberglassed.
1/19/16 - The custom footbrace board is reinforced.
1/26/16 - Custom extended footbraces are assembled.
2/1/16 - Varnishing of the hull is complete.